BLOWER (LLD, F.D & I.D.)

Inspections are conducted to ensure that MPEP Fans not only comply with the customer’s requirements, but that they also maintain MPEP’s high standard of quality. These inspections are conducted throughout the manufacturing process, including: as per Customer requirement Compact design

  • Material preparation and marking
  • Fabrication, welding and machining
  • coating and surface preparation
  • Dynamically balanced impellers,
  • Trouble free & Lower noise level operation
  •  Product final assembly and vibration analysis
  • Final inspection before shipping with QC documentation provided